NEON-rose-fluorescent-poedercoating-poeder coating4all doe het zelf poedercoating NEON-pink-fluorescent-powder-coating-powdercoating NEON-rosa-fluoreszierendes-pulverlackpulver
NEON-rose-fluorescent-poedercoating-poeder coating4all doe het zelf poedercoating NEON-pink-fluorescent-powder-coating-powdercoating NEON-rosa-fluoreszierendes-pulverlackpulver
NEON Pink
POWDER COATING FOR EXTERIOR APPLICATIONS (NO FACADE) 2-LAYER SYSTEM, TRANSPARENT TOPCOAT IS REQUIRED BASE: POLYESTER, BUT ONLY LIMITED UV AND WEATHER RESISTANT

Product number

TGYP5930733

Expected delivery

1-3

€ 23,99 *
Price per 250 gr

Stock :

Quantity: 
Order
 
Wishlist

Do you have a question about this product?

Ask us your question

This powder makes your part really stand out
Tiger's NEON series is so powerful in color that your eyes will be drawn to it.
It therefore gives off a bright pink color and thus stands out extremely against its surroundings

Product: NEON PINK powder coating powder.

THIS NEON PINK IS A 2-LAYER COATING TREATMENT. FINISH WITH CLEAR TOPCOAT
FOR EXTERIOR APPLICATION FINISHING WITH EXTERIOR QUALITY TRANSPARENT TOPCOAT

TREATMENT SCHEDULE = 170 ° C-> 3min to 200 ° C-> 10 min ° C at part at temperature.
CONTENT = 250 grams = therapeutic coverage of 1.5 M²
COLOR = Pink
TGIC = No.
Preferably use personal protective equipment for the respiratory tract, skin and eyes

Processing:

Only use in a 2-layer application (= base coat Neon with Top-Coat Clear matt or gloss).
1. Recommended minimum film thickness Neon base coat: 70-90 µm, clear top coat: 60-80 µm.
2. Curing conditions: gelling
Only hold half of the recommended curing time (gelling) acc. to the corresponding product data sheet for the first layer unless otherwise specified.
The second coat must be cured according to the product information sheet
(full curing). However, the exact cure conditions (cure time and temperature) must be determined individually depending on the application and the coating line.
Check continuously for adhesion between the layers!
3. Stickers: check the suitability for the intended application under your own responsibility.
4. Pay attention to the color change of the base coat when finishing.
5. Due to the higher film structure, mechanical properties are reduced (drilling, milling, cutting).
6. Applying a clear top coat will improve the weather resistance of the coating system, but the system still has a
limited UV and weather resistance.
7. Accept larger color and effect variations between production batches, the effect of which is amplified in a 2-layer
application.

Curing:
1) Base-Coat NEON (gelling model) Product
temperature min.curing time linear schedule
170 ° C 10 minutes up to 200 ° C 3 minutes

2) Top coat clear gloss / matt:
Product curing specified with used powder.

Ask a question about this product

Fields marked with a * are mandatory

Your question has been sent! Thank you.

We will provide you with an answer as soon as possible.

© 2010 - - DutchEcom www.coating4all.com